Aquatic Commons

Diablo Canyon Power Plant site ecological study Quarterly Report No. 5; July 1 - September 30, 1974

Gotshall, Daniel W. and Laurent, Laurence L. and Wendell, Fred E. (1974) Diablo Canyon Power Plant site ecological study Quarterly Report No. 5; July 1 - September 30, 1974. Sacramento, CA, California Department of Fish and Game, Marine Resources Region, (Marine Resources Administrative Report, 74-9)

[img]
Preview
PDF - Requires a PDF viewer such as GSview, Xpdf or Adobe Acrobat Reader
Download (502Kb) | Preview

    Abstract

    During the period July 1 - September 30, 1974, surveys for the Upwelling Period of the random intertidal and subtidal and permanent subtidal stations continued. A total of 11 random subtidal, 9 permanent subtidal and 8 random intertidal stations were sampled in the two study areas. In addition, 9 permanent subtidal stations were remarked with eye bolts, wire rope and new rope and surface buoys. Several inspection dives were made in the Intake Cove Area behind the breakwaters to follow dredging progress. A limited biotic recovery on the periphery of the cove to a depth of 6 m (20 ft) appears to be occurring. (13pp.) Pump operation was also followed closely during testing procedures and at least three problem areas associated with the discharge of cooling waters were found to exist. Interviews of both sea urchin and abalone fishermen working the coastal waters near the plant site were conducted. Activity of urchin fishermen has been fluctuating due to varying gonadal conditions of the urchins. Numbers of sea otters in the Point Buchon to Diablo Cove area have continued to diminish from the numbers observed in spring 1974. However, evidence of foraging, in the form of broken urchin tests, is very strong in Diablo Cove. A new study to establish catch-per-unit-of-effort data of sportfishes by angling was begun this quarter.

    Item Type: Monograph or Serial issue
    Title: Diablo Canyon Power Plant site ecological study Quarterly Report No. 5; July 1 - September 30, 1974
    Personal Creator/Author:
    CreatorsEmail
    Gotshall, Daniel W.
    Laurent, Laurence L.
    Wendell, Fred E.
    Series Name: Marine Resources Administrative Report
    Number: 74-9
    Date: 1974
    Publisher: California Department of Fish and Game, Marine Resources Region
    Place of Publication: Sacramento, CA
    Issuing Agency: California Department of Fish and Game
    Uncontrolled Keywords: Diablo Canyon Power Plant; California; environmental impact
    Subjects: Ecology
    Fisheries
    Biology
    Item ID: 220
    Depositing User: Joan Parker
    Date Deposited: 11 Sep 2007 15:02
    Last Modified: 30 Sep 2011 00:27
    URI: http://aquaticcommons.org/id/eprint/220

    Actions (login required)

    View Item

    Document Downloads

    More statistics for this item...